#eEvents: Full Charging Power for E-Events

A look behind the scenes at our latest major event, the launch of the new all-electric Opel Corsa GSE, attended by several hundred media representatives from across Europe:

  • Calculation of optimal charging capacities by experienced test engineers
  • Two battery-buffered fast chargers with charging capacities of 180 kW and 2 × 90 kW respectively
  • Four further charging stations with a charging capacity of 44 kW
  • Additional mobile wallboxes with 22 kW for overnight/long-term charging
  • Power supply via several high-current connections in our event halls (16 A, 32 A, 63 A)
  • Support and monitoring by STARD eMobility experts

Do you notice anything? Exactly! We’ve finally arrived: in the electric age.
Because it is precisely this sort of infrastructure that is needed today to provide all players in the automotive and supplier industries with the perfect support for their presentations, tests and launches.

This no longer involves ‘merely’ a sufficiently large (and, above all, STABLE) charging infrastructure, but also the necessary staff with the knowledge of new structures, technical specifications and adapted processes.

Above all, however, today’s customers (quite rightly) demand energy from renewable sources. And even that is something we can guarantee 100% at the STARD Driving Camp! ️

P.S.: All the specifications mentioned relate ‘only’ to this event. Through the STARD network, we even have access to EVEN MORE battery storage and other equipment!

Photo credits: Opel Automobile GmbH

Subscribe to our newsletter?

Would you like to be regularly informed about the latest developments, campaigns, partnerships and tips? Not only about the Driving Camp, but also what "Friends + Experts" are up to elsewhere in Austria or Germany?  That would make us happy!

And don’t worry: for us, regular only means when there really is something to report and not more frequently than every eight weeks.

You can subscribe to our personalised newsletter here.

More news